NS Lehigh Line Trackwork
|
|
|
|
NS track gang are removing a bad section of rail before the CNJ bridge over the Delaware.
|
|
|
|
|
|
|
|
|
Look closely above the backhoe on the Easton side of the bridge and it looks like track is in place for the shifting of the tracks to the north side of the bridge.
|
|
|
|
|
Date: March 31, 2009
Location: Phillipsburg, NJ
Digital Photo: Rick Glosser
|
|
|
|
|
|
|
|