Photo 23: OK..last images of the LEHL tie work will show the regulator, tamper machines and redoing the ballast. The final sweeping of the track will come after gang returns and change the switch ties at CP PHILLIPSBURG. There is a front end loader that was dropped off earlier that I would assume will be used at the interlocking. The new long switch ties are still at the location. - Rick Glosser -
  Date: March 29, 2013
Location: NS Lehigh Line, Phillipsburg, NJ
Photo: Rick Glosser